Footings and Foundations

Work started on digging the foundationsShaun stood near the garage
Foundations for the house and garage

Setting levels

The front of the house marked out


Rachael and Oscar do a site inspection after the footing forms are made
More of the framing for footings



Pumper truck arrives ready to pour the footings

The concrete truck (the first of three that day) and pumper


The poured footings


Site inspection after the footings are poured

Footings for the front of the house and deck


Shuttering arrives


Front of the house as shuttering starts to go up





Site inspection with shuttering up


Front foundation wall -back fill will be up to around where Rachael's shoulder level




Garage and house waiting for the concrete. The day after this photo we got 5 concrete trucks and our foundation walls were poured - stay tuned for more photos.